[1]
A. Fidanza, I. Schettini, F. Di Petrillo, M. Saracco, G. Petralia, and G. Logroscino, “A quantitative and qualitative analysis of Time-Driven Activity Based Costing: the waste side of joint replacement”, Acta Biomed, vol. 95, no. 3, p. e2024034, Jun. 2024, doi: 10.23750/abm.v95i3.15387.